The North Bank tunnel concept was a hydroelectric scheme being developed by Meridian Energy on the Waitaki River in Canterbury, New Zealand. The $993 million project was expected to produce an additional per annum, and take up to of water from Lake Waitaki. The project would have resulted in a per annum reduction in output from the Waitaki hydro station. Discovery of geological faultlines prompted a rethink of the project, including consideration of using a canal instead of a tunnel. Work on the project was suspended in January 2013 due to a forecast of flat demand for electricity for the next five years. This project is at a similar location to Project Aqua, a hydroelectric power proposal abandoned by Meridian in 2004. == Resource consent process == In December 2008, Environment Canterbury granted water use consents for this project. Appeals against this decision were made by Ngai Tahu, Ngai Tahu Fishers People Inc, the Lower Waitaki River Management Society and Black Point farmer Garth Dovey. The appeal hearings were held in the Environment Court during June and July 2009, with water rights being granted in September 2009. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「North Bank tunnel」の詳細全文を読む スポンサード リンク
|